Hubby said it will be ready in six months. I am so excited and can hardly wait for the framing to be done and the roof and ceiling to be in place. (We are going with a 10-foot ceiling.) They have just a little more work to complete on the subfloor. The inspector has been pretty cool and has signed off on the construction so far. He will be back to inspect the electrical after the framing and before the drywall. We are both getting excited. Did I tell y'all that we are having a spaghetti sauce cook-off when the kitchen is complete instead of a house-warming?
That is awesome!
Sent from my iPhone using Tapatalk